Coleman Barracks meet new missions

Photo by Chief Sgt. Maj. Cameron Porter
Private Rob Thorton, a construction equipment maintainer with 1st Armored Brigade Combat Team, 3rd Infantry Division, and Ron Jones, a contractor at Coleman Work Site, conduct a joint inventory and inspection of equipment Sept. 30 at the European Activity Set staging area. Instead of closing, Coleman was selected as U.S. Army Europe’s site for the EAS, where thousands of vehicles and pieces of equipment could receive depot-level maintenance and full reset, be staged and stored, and ultimately be issued back out to Army combat brigades rotating in and out of Europe.
Private Rob Thorton, a construction equipment maintainer with 1st Armored Brigade Combat Team, 3rd Infantry Division, and Ron Jones, a contractor at Coleman Worksite, conduct a joint inventory and inspection of equipment Sept. 30 at the European Activity Set staging area. Instead of closing, Coleman was selected as U.S. Army Europe’s site for the EAS, where thousands of vehicles and pieces of equipment could receive depot-level maintenance and full reset, be staged and stored, and ultimately be issued back out to Army combat brigades rotating in and out of Europe.